WHAT IS HIRA

HSE OFFICER

HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)

HIRA risk matrix

The objective of the Hazard Identification Risk Assessment (HIRA)

HIRA FOR CONSTRUCTION SITE

What is HIRA & Objective of HIRA: The objective of the Hazard Identification Risk Assessment (HIRA) is to identifying and assessing the hazard associated during the construction of the project and thereby controlling the risk by implementing mitigation measures before the start of the work to avoid the incident. HIRA helps to become proactive rather than just reactive.

CLICK HERE FOR 👉 JSA

The following terms used in HIRA

ALARP: As Low As Reasonably Practicable. This is the level, where the time, effort, difficulty, and cost of further reduction measures becomes disproportionate to the additional risk reduction from the incremental effects.

CLICK HERE FOR 👉 PPE IS CODE

CLICK HERE FOR 👉 CORONAVIROUS SAFETY PLAN

CONSEQUENCE: The unmitigated impact of the hazard in terms of People, Environment, Asset, and Reputation.

WHAT IS HAZARD?

Hazard is a potential condition awaiting to be converted into an accident if proper precautions are not taken into consideration. Hazard is the mother of the accident.

HIERARCHY OF CONTROLS: Order of preference in the application of risk mitigations. The order is: Eliminate, Substitute, Isolate, Engineer, Administration, and PPE.

PROBABILITY: The possibility of the event happening.

WHAT IS RISK?

The chances of a hazard actually causing an injury or disease. MAJOR RISK: A risk that has the potential to result in a Major Accident classified as high risk to people, assets, the environment and/or company reputation as defined in TPL SHE Risk Matrix.

CLICK HERE FOR 👉 ENVIRONMENT MANAGEMENT PLAN FOR CONSTRUCTION SITE

The acronyms used in HIRA have the meaning defined below:

E&IElectrical and Instrumentation
HIRAHazard Identification Risk Assessment
SHESafety, Health, and Environment
HRAHealth Risk Assessment
RAMRisk Assessment Matrix
OCPOperational Control Procedure
HIRACHazard Identification Risk Assessment and Control

CLICK HERE FOR 👉 SWL AND SAFETY FACTOR

HIRA ORGANISATION STRUCTURE FOR CONSTRUCTION SITE

HIRA ORGANISATION STRUCTURE

RESPONSIBILITIES OF HIRA TEAM

S. No.PersonResponsibility
1.RCM/CPM/PM1. RCM is a process owner.
2. To form a HIRA Cross-functional team along with Site In-charge/Engineer (Civil, Electrical, Mechanical), Safety In-charge, Fleet, HR/Admin, and subcontractor representative.
3. Any material to be required as per the Precautionary measures and proposed control measures need to arrange
4. To review the updated HIRA and approve it.
2.Site In-charge1. To prepare the Method statement of each activity.
2. To participate in preparing HIRA.
3. To incorporate all the Hazard & appropriated precautionary measures as per the site environment, to bring down the risk level to the acceptable risk and communicate down the level.
4. Before issuing PTW ensure all precautionary measures are in place.
5. Ensure HIRA talk by site supervisor before starting the activity.
3.Safety In-charge1. Work as Facilitator to prepare HIRA based on the method statement.
2. Ensure all concerned person is available for preparing HIRA.
3. To incorporate all the Hazard & appropriated precautionary measures in HIRA format along with responsibility.
4. Communicate updated HIRA to all concern for implementation and ensure all precautionary measures are in place. The same shall be communicated to SBG SHE Head and Corporate SHE Team.
5. To ensure safety supervisor shall monitor for any deviation.
6. If any deviation, escalate to Site In-charge, RCM/CPM/PM, and SHE Head.
4.Sub-contractor
Representative
Follow the precautionary measure as per the HIRA

FREQUENCY OF HIRA FOR CONSTRUCTION SITE

  • The site Team needs to prepare Dynamic HIRA along with the proposed control measure on the basis of Master HIRA.
  • HIRA needs to be prepared before the start of each activity.
  • HIRA needs to be updated after the occurrence of any incident, management of change, change of work methodology, and change of any regulation. If there is no change then it should be reviewed half-yearly.

You are reading at rlshumancare.com. Do not forget the name RLS HUMAN CARE. Please share with your friends and help RLS HUMAN CARE. Thank You!!

METHODOLOGY OF HIRA

The HIRA review is the structured multidisciplinary hazard identification, risk assessment, and methodology that provides a detailed review of hazard, risk, and control of the construction activities. The review is facilitated by the relevant construction personnel in the brainstorming session.

CLICK HERE FOR 👉 SAFETY OFFICER INTERVIEW QUESTIONS

Overview of HIRA Methodology

Overview of HIRA Methodology

HIRA Flowchart

HIRA Flowchart

Steps of HIRA review is summarised as follows:

  • Classify work/assessment units or work activities during the construction phase (based on Work Method Statement).
  • Identify the hazards associated with work activities.
  • List the Consequence of the hazard involved in the activity.
  • Assess and score the risk (i.e. probability X severity) using the Risk Matrix as per TPL Risk Assessment Matrix (RAM).
  • List out present controls (preventive and recovery).
  • Assess the risk based on present controls.
  • Reassess the medium and high risk to bring it down to acceptable risk.
  • Verify compliance to regional Regulation, Project Specifications, and applicable international codes and standards.

TPL SHE RISK ASSESSMENT MATRIX

For each of the identified hazards, the level of risk is assessed based on the TPL SHE Risk Assessment Matrix during the HIRA review. Risk ranking is firstly performed based on the unmitigated risk for each hazard, and then the level of risk is re-evaluated after taking into consideration of the existing prevention/mitigation measures and controls.

HIRA RISK ASSESSMENT MATRIX

If the risk is in the Green region on the TPL SHE RAM, this is broadly acceptable and no further action is required. If the risk is in the Yellow region on the TPL SHE RAM, this is in the tolerable regions and needs to be demonstrated to be As Low As Reasonably Achievable (ALARP) by recommending further action.

If the Risk is still in the Red region, this is not acceptable and action definitely needs to be taken. HIRA Review team shall discuss the proposed actions, where applicable, to address the hazard that is ascribed with a medium to high-risk rating.

CONTROL MEASURES

Controls are required to be separated into preventive and recovery. Controls are required to be categorized using the hierarchy of controls (eliminate, substitute, isolate, engineering, administrative, and PPE). This allows the review of controls to ensure the principle of inherently safer construction is being applied.

HIRA CONTROL MEASURES

EFFECTIVENESS

  • Present Risk reduced to Acceptable Risk
  • Reduction of incident
  • Reduction in repetitive observation
  • Improvement in Behavioural Safety

DOWNLOAD HIRA IN PDF

DOWNLOAD HIRA FOR CONSTRUCTION SITE IN WORD NEW [EDITABLE]

DOWNLOAD JSA FOR CONSTRUCTION SITE

Also, read this:

You are reading at rlshumancare.com. Do not forget the name RLS HUMAN CARE. Please share with your friends and help RLS HUMAN CARE. Thank You!!

People also search for

  • hira in safety in hindi
  • hira full form in hindi
  • hazard identification and risk assessment in hindi
  • hira format excel
  • hazard identification and risk assessment format excel
  • hazard identification and risk assessment format
  • hira worksheet
  • hira ppt
  • hazard identification and risk assessment (hira)
  • hazard identification methods

PLEASE SHARE THIS ARTICLE WITH YOUR RELEVANT FRIENDS